Basic preparation for the job the most important thing about installing standing seam is to measure the roof.
Standing seam metal roof installation instructions.
Necessary tools materials and supplies a roofing hatchet or a carpenter s hammer.
Snap lock standing seam metal roof installation factory made panels and flashing go together without specialty tools or subcontractors.
Use hip ridge flashing to locate correct position of zee closures.
Fasten with appropriate substrate fastener at minimum 4 fasteners per zee or 3 inches on center.
Ordering and applying trim the most common flashing for standing seam roofing is the ridge cap which is used at the.
Installation of panels roof panels we require at least a 3 12 pitch for standing seam panels to ensure proper water drainage.
Check out our install guides for our products at metal sales.
This was the case on a.
Each panel is laid vertically over roofing paper.
Lay each panel lengthwise from ridge to eave and tuck neatly into the ridge vent.
This means that the minimum roof slope required for panels is 3 inches of rise per foot.
Install zee closures onto panels at both sides.
I prefer a hatchet but in some.
By andrew grace issue 272 january 2018.
First focus on removing the oldest shingles that are sticking out as well as any flashing or vents.
Rivet hip ridge flashing to top flange of zees at 18 inches on center both sides.
Secure each panel with clips.
Snap the panels together and fasten along the opposite side and top of the panel.
Standing seam metal roof installation process.
When you re a remodeler in a rural location you often have to venture into uncharted territory because there s nobody else to do the job.
From underlayment venting layout.
Remove any nails sticking out and reposition any metal gutters so that water flows properly off the roof.
How to install a standing seam metal roof step 1.
We cover all the basics of metal roof installation.
Place sealant over underlap rib before sliding hem over the eave trim.
Then remove the rest of the roof including all the shingles.
Snap first two to three inches of panel together and slide the panel tight against the eave trim or with the gap depending on the temperature.
Apply roofing paper over the roof sheathing then over each.
Apply a row of tube sealant along back face of zee closure adjacent to panel legs.