Measure the area you want to cover and add 10 percent for waste.
Subfloor preparation for laminate flooring.
The appropriate types of laminate flooring subfloor include.
Plywood will be big enough to span the distance of any imperfections in the floor making it level.
Roll on a layer of latex primer sealer.
Some laminate flooring products have the underlayer attached to the planks.
And by floating we mean that it doesn t need to be nailed or glued to the sub floor.
Exterior grade plywood subflooring.
Fill seams in the subfloor with caulk.
To level a subfloor for installing laminate follow the directions above to remove high and low spots.
Tape off any affected vents with painter s tape.
Check for dips in the floor by sliding a 4 foot to 6 foot straight edge in different directions all around the room.
Preparing the subfloor before you install your subfloor must meet four requirements.
Residential carpet carpet underlayment.
Subfloor preparation for laminate flooring by anthony pallandro nalfa certified installer laminate flooring is designed to be a floating floor that may be installed over virtually any type of sub floor.
Bestlaminate august 24 2010 installation guides comments off on laminate flooring installation subfloor preparation types and requirements 3 745 views share tweet.
If you are working with wood subfloor and you find that there are some extremely uneven surfaces you may want to apply new plywood over the top of the subfloor.
The subfloor materials not suitable for laminate flooring.
This prepares and seals the surface for the.
Laminate planks snap together and float above a subfloor which means tiny subfloor imperfections are okay although again a level subfloor will help prevent damage.
If you have one of these types of flooring you must remove it before installing your laminate.
Because laminate is noisier and harder than wood the underlayer cushions the floor and helps reduce noise.
Prep a plywood subfloor for hardwood or laminate flooring look beneath the surface.
Step 1 lay the plywood first take the plywood and lay it down on the floor.
Pull up the current floor.